Our Work
Solution study · Geospatial

Ground-Condition Screening for Solar Sites, from a Single Lat-Long

Enter a location and get a screening report on sun, wind, dust, land, water and hazard risk, for rooftop, ground, lake or ocean solar.

SUNWINDDUSTLANDWATERHAZARD26.9124° N70.9023° EOR DRAW A BOUNDARYROOFGROUNDLAKEOCEANSCORE 64 / 100

At a glance

Industry
Solar developers, EPCs, investors and lenders, and site-selection teams
Proposed solution
A geospatial site-assessment platform
Input
A latitude and longitude, or a boundary drawn on the map
Best for
Shortlisting sites before paying for field surveys

Executive Brief

Problem

Friction & Pain
Arrives in many forms
Radiation
Wind
Terrain and hazards
Water
Reconciled by hand, over weeks
One site assessed

Teams assess fewer sites, or find a deal-breaker after money is spent.

Key operational bottlenecks

  • Choosing a solar site means gathering radiation, wind, terrain, hazard and water data from many separate sources, then reconciling them by hand.
  • It takes weeks per site, so teams assess fewer sites than they should, or find a deal-breaker such as a flood plain or unstable dunes after money is already spent.

Current scenario

Baseline Systems
What we would work with
  • Radiation, wind, hazard, terrain, water dataPublic or licensed
    To provide
  • A coordinate or boundaryAnd the site type
    To provide
  • Field surveysFor shortlisted sites
    Optional
Screening runs before any survey

Existing tools & assumptions

  • Long-term radiation, wind, hazard, terrain and water datasets can be accessed, public or licensed.
  • A site is given as a coordinate or a drawn boundary, with its type chosen.
  • The report is a screening step, to be followed by field surveys for shortlisted sites.

Solution

Gödel Engine
Screening AILive
One report per site
  1. Site AStrong on sun, land and water
  2. Site BFlood risk flagged
  3. Site CUnstable dunes

Weak sites drop early; strong ones go forward with evidence.

Proposed core capabilities

  • Location and boundary input
  • Dataset gathering per site type
  • Factor scoring with history
  • Generation estimate with yearly degradation
  • Side-by-side comparison and export
Card 1 of 3 · Problem

How the workflow would run

  1. Pick the location

    A lat-long is entered or the site boundary drawn, and rooftop, ground, lake or ocean chosen.

  2. Pull the data

    The platform gathers long-term satellite and climate records for that exact spot.

  3. Score each factor

    Radiation, wind, dust, terrain and hazards are scored and mapped, with history shown where a trend matters, such as water levels over the years.

  4. Estimate generation

    Expected output and its yearly decline from panel degradation are calculated from the site's conditions.

  5. Compare sites

    Several locations can be ranked side by side and the report exported for investment or lender discussions.

What it would check, by site type

Site typeWhat the report would assess
RooftopSolar radiation, wind, shade, dust and soiling loss, expected generation, rain, snow and other hazards, electricity output prediction, panel degradation over the years
Ground-mountedRadiation, wind, dust, land quality (dunes, land stability), vegetation growth, earthquake, flood and fire risk, expected panel generation
Lake-mountedRadiation, wind, dust, water levels, historical water stability, flooding
Ocean-mountedRadiation, wind, dust, water levels, historical water stability, flooding

Phases and dependencies

The order we would build it in, and what each phase needs first.

  1. Phase 1

    Ground-mounted sites

    The full report for ground-mounted plants.

    Needs first: Datasets for radiation, wind, land and hazards.

  2. Phase 2

    Other site types

    Rooftop, lake-mounted and ocean-mounted reports.

    Needs first: Water-level and stability history, and rooftop data.

  3. Phase 3

    Comparison and export

    Ranking several sites and exporting the report.

    Needs first: Agreed scoring weights.

Scope

Included
  • A screening report per site with scores, maps and reasons
  • Generation estimate with yearly degradation
  • Comparison of several sites
Not included
  • Field surveys and geotechnical studies
  • Land title and permitting checks
  • Treating a score as a substitute for a site visit

How success would be measured

Key operational metrics and performance indicators tracked against baseline.

  • Time to screen a site, compared with gathering the data by hand
  • Number of sites assessed in the same time
  • Deal-breakers found before land is committed
  • Agreement between the screening and later field surveys

More in Geospatial

View all Geospatial work

Put satellite intelligence on your own sites

before the next site visit is scheduled.