Our Work
Solution study · Geospatial

Rooftop Solar Capacity Estimation from Satellite Imagery

Find the industrial rooftops worth calling, and estimate how many kilowatts each can host, before the first site visit.

410 kWpPANELS 38BILL · 61 MWh

At a glance

Industry
Rooftop solar EPCs and developers
Proposed solution
A lead identification and capacity estimation engine
Data
Satellite imagery, electricity consumption data, location intelligence data
Best for
Industrial and commercial clusters with large shed roofs

Executive Brief

Problem

Friction & Pain
Arrives in many forms
Roof too small
Too shaded
Low power use
Cluttered roof
Each one surveyed in person
Few prospects convert

Slow and expensive for every lead that goes nowhere.

Key operational bottlenecks

  • Rooftop solar sales teams spend most of their time on prospects that never convert: a roof that is too small, too shaded or cluttered, or a business whose power use does not justify a system.
  • Surveying each one in person is slow and expensive.

Current scenario

Baseline Systems
What we would work with
  • A chosen city or cluster
    To provide
  • Satellite imagerySufficient resolution
    To provide
  • Shared electricity billsMatched to buildings
    Optional
  • Team CRMFor lead export
    In place
Lead engine scores every building

Existing tools & assumptions

  • A target city or industrial cluster is chosen.
  • Satellite imagery of sufficient resolution covers it.
  • Prospects who share electricity bills can be matched to their buildings.
  • Leads can be exported to the team's CRM.

Solution

Gödel Engine
Lead engineLive
Demand and roof space, together
  1. Cold-storage shedLarge free roof, high demand
  2. Textile unitGood roof, moderate demand
  3. Small workshopCluttered roof

Each lead comes with an estimated system size in kWp.

Proposed core capabilities

  • Roof outline and usable-area detection
  • Demand estimate from bills and business type
  • Capacity estimate in kWp
  • Ranked lead list with CRM export
Card 1 of 3 · Problem

How the workflow would run

  1. Estimate demand

    Electricity bill data gives actual consumption where a prospect shares it. Location intelligence services identify the business type and scale of nearby facilities, giving a demand estimate for those that have not.

  2. Measure the roof

    Satellite imagery outlines each shed and separates usable area from skylights, equipment, tanks and shaded zones.

  3. Size the system

    Usable area converts to an estimated capacity in kWp, matched against the demand estimate.

  4. Rank and export

    Leads are scored by fit and exported to the CRM with the roof outline, capacity estimate and contact details.

Phases and dependencies

The order we would build it in, and what each phase needs first.

  1. Phase 1

    Roofs in one cluster

    Outline roofs and usable area for a single industrial cluster.

    Needs first: Imagery for the cluster.

  2. Phase 2

    Demand and sizing

    Demand estimates and capacity per building.

    Needs first: Bill data where available and place data for the rest.

  3. Phase 3

    Ranking and export

    Scored leads sent to the CRM.

    Needs first: The CRM's import format.

Scope

Included
  • Roof outlines and usable area
  • Demand and capacity estimates
  • A ranked lead list with export
Not included
  • Structural or shading engineering
  • Site surveys and final proposals
  • Guarantees on a prospect's electricity use

How success would be measured

Key operational metrics and performance indicators tracked against baseline.

  • Site surveys needed per signed contract
  • Time to produce a proposal-ready estimate for a building
  • Estimated against surveyed capacity on a sample of roofs
  • Quote-to-close rate on leads from the list

More in Geospatial

View all Geospatial work

Put satellite intelligence on your own sites

before the next site visit is scheduled.