Brass Costing and Scrap-Yield Control
Quote and cost every job at today's copper and zinc rates, and see where purchased brass is lost before it becomes a saleable part.
At a glance
- Industry
- Brass forging and machining units (small to mid-size)
- Proposed solution
- A live costing engine and yield tracker
- Data
- LME-linked copper and zinc rates, bills of material, weighments at each stage
- Best for
- Units that quote on a standard rate updated monthly, or only when someone notices a gap
Executive Brief
Problem
Friction & PainScrap and yield loss are barely tracked, so nobody knows which jobs made money.
Key operational bottlenecks
- Brass is priced off LME copper and zinc rates, which move almost daily.
- Many units still quote and cost jobs on a standard rate that changes monthly.
- Scrap and yield loss, the difference between the weight of brass bought and the weight that leaves as finished parts, is tracked loosely if at all.
- Margin leaks in both places and nobody can say which jobs made money.
Current scenario
Baseline Systems- Copper and zinc ratesLicensed feedTo provide
- BOM and alloy mixTo provide
- Stage weightsScales or tablet entryTo provide
- Purchase and dispatchStart with one monthIn place
Existing tools & assumptions
- A licensed market-data feed for copper and zinc rates can be subscribed to.
- Bills of material and alloy compositions are available for the parts quoted.
- Weights can be captured at each stage, from scales or by tablet entry.
- Purchase and dispatch records can be shared, starting with one month.
Solution
Gödel Engine- Job with the biggest lossWeight in vs weight out
- Job with a thin quote marginPriced on an old rate
- Job running on target
Scrap becomes a number per job, machine and shift.
Proposed core capabilities
- Metal-rate feed and alloy cost table
- Part costing and quote margin
- Stage weighment capture
- Loss split and yield alerts
How the workflow would run
Link to metal rates
Copper and zinc rates come in through a licensed market-data feed and update the cost of each alloy grade.
Cost by part
A part's cost combines metal at today's rate, conversion cost and expected yield, with the margin shown before the quote goes out.
Weigh at each stage
Weights are captured at issue, forging, machining and dispatch, from scales or tablet entry.
Split the loss
The gap between purchased and shipped weight is divided into recoverable scrap (swarf and flash that is remelted or sold), rejections and unexplained loss.
Alert and compare
Jobs, machines or operators whose yield falls below target are flagged, and quoted cost is compared with actual cost per job.
Phases and dependencies
The order we would build it in, and what each phase needs first.
- Phase 1
Rates and costing
Live metal rates and part costing on new quotes.
Needs first: The rate feed, bills of material and alloy data.
- Phase 2
Weighments
Weights at issue, forging, machining and dispatch.
Needs first: Scales or tablets at each stage.
- Phase 3
Loss split and alerts
Recoverable, rejected and unexplained loss, with yield alerts.
Needs first: Weighments from phase 2 across enough jobs to compare.
Scope
- Live metal-rate costing
- Stage weighments
- Loss split by job, machine and shift
- Quoted against actual cost per job
- Metal hedging or purchasing advice
- Accounting entries
- Process changes to reduce scrap, which the data would inform but not make
How success would be measured
Key operational metrics and performance indicators tracked against baseline.
- Time to price a quote at current rates
- Yield, as finished weight over purchased weight, before and after
- Unexplained loss as a share of purchased brass
- Days between dispatch and a job's profit being known
More in Enterprise OS
View all Enterprise OS workBring traceability, schedules and costing into one system
that works alongside your ERP.