OEM Schedule and EDI Integration

Turn every OEM delivery schedule into planned production and a correct shipping notice, without retyping a single line.

EDI 830PORTALEXCELPDFEMAILSTANDARD FORMREV C → DFROM EXCELERPSales ordersProduction planStock · capacityASN + INVOICE OUT

At a glance

Industry
Auto-component suppliers (forging, machining, castings) serving OEMs and Tier-1s
Proposed solution
Schedule ingestion and EDI integration connected to the ERP
Inputs
EDI messages, supplier-portal downloads, Excel and PDF schedules, emails
Best for
Suppliers receiving frequent, changing schedules from several customers

Executive Brief

Problem

Friction & Pain
Arrives in many forms
EDI message
Portal download
Spreadsheet
Emailed PDF
Retyped by hand, every week
ERPOrders and plan

A missed revision means the wrong part, a late shipment and a penalty.

Key operational bottlenecks

  • Each OEM sends delivery schedules differently: EDI messages, portal downloads, spreadsheets or emailed PDFs.
  • Someone retypes them into the ERP, schedules change weekly, and a missed revision means the wrong part is made or shipped late.
  • Penalties and line-stoppage claims follow, and so does the OEM's scorecard rating.

Current scenario

Baseline Systems
OEM schedule channelsEDI, portals, mailboxes
A person re-keys each release
ERPSales orders, stock, plan

Each OEM's format and ASN rules are known; we read from their channels.

Existing tools & assumptions

  • An ERP holds the sales orders, stock and production plan.
  • Each OEM's channel and format is known, and a sample schedule from each is available.
  • The advance shipping notice (ASN) format each OEM expects is documented.
  • Access to supplier portals and mailboxes can be granted for reading schedules.

Solution

Gödel Engine
EDI
Portals
Mailboxes
Sheets
Connector layerLive
One standard schedule
  • Revision flag
  • Diff vs last release
ERP updated
ASN and invoice out

Proposed core capabilities

  • Schedule intake from EDI, portals and mailboxes
  • Standard schedule format with a revision flag
  • Comparison of each release with the last
  • ERP order and plan updates
  • ASN and invoice output
Card 1 of 3 · Problem

How the workflow would run

  1. Receive

    Delivery schedules and forecasts are picked up from EDI channels, supplier portals and mailboxes, including PDF and Excel attachments.

  2. Standardise

    Each schedule is converted to one structure: part number, quantity, date, ship-to and a revision flag. Standard delivery and planning schedule messages are handled natively.

  3. Compare and update

    A new release is compared with the previous version and the changes are highlighted. Sales orders in the ERP are created or amended.

  4. Check capacity and stock

    Planners see schedule demand against finished stock, raw material and machine capacity, with shortfalls flagged early.

  5. Ship and notify

    At dispatch, the ASN and invoice data go out to the OEM, matched to the schedule line.

Phases and dependencies

The order we would build it in, and what each phase needs first.

  1. Phase 1

    One OEM, one channel

    Ingest and standardise a single customer's schedule.

    Needs first: Sample schedules and read access to that channel.

  2. Phase 2

    Compare, update and plan

    Revision comparison, ERP updates and the capacity check.

    Needs first: Phase 1 in use and an agreed ERP integration method.

  3. Phase 3

    Shipping notices and more OEMs

    ASN and invoice output, then the remaining customers.

    Needs first: Each OEM's ASN format and a test channel.

Scope

Included
  • Schedule intake and standardisation
  • Revision comparison
  • ERP order and plan updates
  • ASN and invoice output
Not included
  • Negotiating access to OEM portals
  • Replacing the ERP
  • Demand forecasting beyond the schedule data

How success would be measured

Key operational metrics and performance indicators tracked against baseline.

  • Time to enter a schedule release, compared with retyping it
  • On-time-in-full delivery, before and after
  • Share of schedule revisions caught on the day they arrive
  • Penalties and disputes over what was ordered